Project 4A progress report

Just a quick update on the envelope progress. A couple of things still need to be worked out such as the actually fin shape. Judging from the current outcome, they may have to trimmed down slightly in order to avoid knocking into the adjacent units. Though the position in this first render of the units is wrong, I don't think it will be a problem in the overall scheme.
Note: All cells will have glazing like the two in the middle.


Detail of Fin pivot connection in the open position.

Detail of the fin pivot connection in the closed position.




A look at the piston assembly. (closed position)




View from inside the space looking up at the roof assembly. Piston in open position in the foreground, and closed position in the background.





Detail of 3-point connection.